1. INTRODUCTION TO STUDY
1.1 Topic Of Study
1.2 Background of the study
1.3 Problem definition and objective
1.4 Methodology
1.5 Limitation
1.6 Scheme of study
2. ABOUT IDUKKI PROJECT
2.1 The geographical context of Idukki Project
2.2 Uniqueness of Idukki Project
2.3 Early history of Idukki Project
2.4 Structural Details
2.5 Preparatory Works
2.6 Anticipated Benefits
2.7 General Features
2.8 Scenario of Muvattupuzha Valley Irrigation Project in the Irrigation Kerala
2.9 Endeavours to Bring into Being MuvattupuzhaValley Irrigation Project
2.10 Benefit from irrigation
References
3. SOCIAL COST BENEFIT ANALYSIS
3.1 Introduction
3.2 The need for social cost benef analysis
3.2 The need for social cost benefit analysis
3.3 Evalution of SCBA
3.4 Rate of discount
3.5 Opportunity costs and shadow price
3.6 Opportunity costs and Foreign Exchange
3.7 Taxes and other transfer payments
3.8 Opportunity costs of good
3.9 Criteria for Economic and Financial Appraisal
3.10 Numearaire and different methods of SCBA
4. SURVEY OF LITERATURE
4.1 Studies international level
4.2 Studies at National level
4.3 Studies at the State level
4.4 General findings on studies on the impact of Irrigation
9. PROBLEMS OF THE PEOPLE WHOSE LAND WAS ACQUIRED FOR MALANKARA DAM OF MUVATTUPUZHA VALLEY IRRIGATION PROJECT
Introduction
Objective of the study
Limitations
Problems in connection with acquisition
10. FINANCIAL COST OF MVIP
11. BENEFITS FROM MUVATTUPUZHA VALLEY IRRIGATION PROJECT
Financial benefts from mvip
Analysis
Economic benefits from MVIP
References
12. SURVEY AT ARAKKUZHA TO ESTIMATE THE IMPACT OF MVlP
Availability on water
Impact of agriculture